Skip to content
STOCKLOT GROUP
Water-filled agricultural irrigation reservoir lined with black geomembrane and fenced, between hills; two site staff and a pickup at the edge — AI concept image

Sulama Havuzu Yaptır · A Stocklot brand

Agricultural water storage and irrigation reservoir solutions

Project-specific geomembrane-lined water storage reservoirs for orchards, vineyards, greenhouses, cooperatives and large agricultural operations. Site survey, installation planning and the site process in one flow.

Write on WhatsAppLeave your number, we call you

For the first call, province/district, a phone number and an approximate volume in m³ are enough.

What we do

The right solution for the project.

No two sites, water sources or operations are the same; our approach is not a one-size package but the right solution for the project scale and intended use.

  • 01

    Geomembrane-lined irrigation reservoir

    Excavation, slope layout, protective layer and geomembrane lining for agricultural water storage.

  • 02

    Water storage planning

    Reservoir size and placement based on target volume, water source and usage rhythm.

  • 03

    Site survey and preliminary assessment

    On-site review of terrain, slope, access and ground conditions.

  • 04

    Installation partner coordination

    Excavation, lining and fencing steps planned from one desk, with site follow-up.

On site

From excavation to a full reservoir.

  • Irrigation reservoir excavation: excavators and trucks working in a sloped pit, forested hills behind — AI concept image
    Excavation and slope layout
  • Site crew laying black geomembrane over white protective geotextile, membrane rolls at the edge — AI concept image
    Protective layer and geomembrane deployment
  • Aerial view of an irrigation reservoir fully lined with black geomembrane before filling, with perimeter fence — AI concept image
    Fully lined reservoir with perimeter fencing

Who it is for

Any site with a high-volume water need.

No site gets the same solution. Target volume, terrain, access, safety, material and installation scope are assessed per project.

  • 01Large-scale agricultural operations
  • 02Orchard, vineyard and greenhouse investments
  • 03Cooperatives and producer unions
  • 04Operations planning irrigation infrastructure
  • 05Municipalities and corporate land managers
  • 06Sites with high-volume water storage needs

Process

Four steps from first call to installation plan.

  1. 01

    First information

    Phone, province/district and approximate volume. That is enough to start.

  2. 02

    Preliminary technical assessment

    Scope and feasibility are assessed from volume, terrain and access information.

  3. 03

    Site survey and quote

    On-site review; water volume, excavation volume and lining area are calculated separately and the quote follows.

  4. 04

    Installation planning

    Material, crew and site sequence are set; installation partners are coordinated.

Technical confidence

Calculated separately for every project.

  • Target water volume
  • Terrain and slope
  • Lining area and water volume calculated separately
  • Suitable geomembrane and protective layer selection
  • Installation detail and site coordination
  • Safety fencing

The final technical solution is determined by project conditions, material suitability and site conditions.

FAQ

Before you get in touch.

What information is enough to apply?
Province/district, a phone number and an approximate target volume (m³). The rest is gathered in the preliminary assessment and site survey.
Are m³ and membrane area the same thing?
No. m³ is the volume of water to be stored; membrane area is the surface covering the floor and slopes of the reservoir (m²). They are calculated separately; the same volume needs a different lining area at a different depth and slope layout.
Is the same material used in every project?
No. Geomembrane thickness, protective layer and details are set per project according to target volume, ground, climate and intended use.
Is membrane supply only possible?
Yes. For operations with their own crew, supply of geomembrane and protective layer alone is also considered; the installation scope is settled in the first call.
How is the quote put together?
Per project. In the site survey, water volume, excavation volume and lining area are calculated separately; material, installation scope and site conditions enter the quote through that calculation.
Can installation start right away?
Installation begins after the preliminary assessment, site survey and planning are complete. The schedule is settled in the survey together with site conditions and scope.

Leave your number

We call you back.

Name and phone are enough; province/district and an approximate volume speed up the preliminary assessment.

* Required